2:00 PM - 6:00 PM Eastern
New Upcoming Events
Join MWEA's New Professional Committee
for a Tour and Mixer in Wyoming, MI!
FREE to Attend!'
When: Thursday, November 7, 2024 2PM-4PM, happy hour 4PM-6PM
What: Plant tour of the City of Wyoming WRRF with happy hour after, at Two Guys Brewing.
Food and Drink tabs have been picked up by our sponsors, so this event is FREE to attend!
Thank you to our Mixer Sponsors: | ||
More Details Below
City of Wyoming Clean Water Plant
2350 Ivanrest Ave SW
Grandville, MI 49418
UNITED STATES
click here for Google Maps
(phone: 517-641-7377)
When: Thursday, November 7, 2024 2PM-4PM, happy hour 4PM-6PM
What: Plant tour of the City of Wyoming WRRF with happy hour after, at Two Guys Brewing. Food and Drink tabs have been picked up by our sponsors, so this event is free to attend!
Closed Toed Shoes are Required.
TOUR Address: City of Wyoming Clean Water Plant, 2350 Ivanrest Ave SW, Grandville MI, 49418 (North of the intersection at Ivanrest Ave and Chicago Dr)
Plant Description: The City of Wyoming Clean Water Plant has a design flow of 27 mgd, a peak flow of 42mgd, and an average daily flow of 14mgd. The collection system consists of 12 lift stations and encompasses all of the City of Wyoming, Byron & Gaines townships, and about half the City of Kentwood. Once the flow arrives at the Clean Water plant there are two ½ inch Vulcan bar screens followed by vortex grit removal. From there the wastewater travels to the four covered primary clarifiers. The flow is then split into three aeration basins that are designed with anoxic zones before entering the basins, this is where our biological phosphorus (Bio-P) removal takes place and in 2016 we upgraded to fine-bubble membrane diffusers. We are currently in the process of upgrading our old centrifugal blowers to APG Neuros Turbo Blowers. After the microorganisms have removed much of the nutrients from the wastewater in the aeration basins the water flows to four finals. The last step in the process is our most recent upgrade, Ultra-Violet light disinfection with Trojan Signa UV lights. Other exciting things at the Clean Water Plant include a Biofilter for Odor Control, Centrisys dewatering centrifuge, Household Hazardous Waste site, A Headworks improvement project, a Digester feasibility study, and a Biosolids drying study.
MIXER Address: Two Guys Brewing, 2356 Porter St SW, Wyoming, MI 49519
QUESTIONS? Contact MWEA New Professional Committee Chair, Lexie Davis: adavis@hrcengr.com OR 616-240-0915